Things are moving along nicely. The main loft is almost finished, as is the stairwell. The front gates have had their coat of undercoat, ready for the proper paint and the papering is still to be done. The front gates were in need of some attention so it was lucky for us that the workman took a whole load of paint off them when they jet-washed the drive at the end of the build – newly painted gates at no cost to us.
Loft Progress #32
Published by Ruth
Life in West London; married to The Brainy One; mum to The Boy Child. This is where I share most aspects of my everyday life. I hope you'll stay awhile. View all posts by Ruth
Published