Loft Progress #4




Yours truly braved the ladder today and went to up onto the scaffolding to see what was going on. Jumping up and down in the back garden has not given me any satisfactory insight into what has been going on!! The first 2 images were taken this morning when the old loft hatch was being removed, in preparation for the loft floor going down. (Note the water damage on the ceiling on #2 from when the old water tank leaked!) Number 3 is the roof minus the slates but with the Velux frames in place under the felt and number 4 shows the Velux at the back of the house (area over the bathroom).

2 thoughts on “Loft Progress #4

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

w

Connecting to %s